FPN: See 4.8.3.7 (a) for service equipment in control panels and see 4.30.8.4 for service equipment in engine control centres. If the service insulation consists of more than one switch or circuit breaker as specified in clause 2.30.6.2, the combined rated power of all switches or circuit breakers used shall not be less than the rated power specified in 2.30.6.10. Exception 3: The circuits of demand response devices may be connected to the power side of the overcurrent equipment in operation if they are separately equipped with overcurrent protection. (5) Valves used solely to supply load management equipment, emergency power system circuits, fire pump equipment and fire and sprinkler alarms, provided that they are equipped with service equipment and installed in accordance with the requirements applicable to plant managers. b) Not in grounded ladders. No overcurrent device shall be installed in a grounded operator, except for a circuit breaker that simultaneously opens all conductors in the circuit. Exception: conductors other than operations managers may be installed in a cable tray equipped with service entry ladders, provided that a fixed solid barrier made of material compatible with the cable tray is attached to separate the operators from other conductors installed in the tray. Surface installations shall be protected against physical damage in accordance with point 2.30.4.11(a) or (b). The service scale shall not be readily accessible and shall be equal to 2.30.2.3 (a) to (d) for services not exceeding 600 volts, nominal. (b) Cabling Methods.

Managers shall be installed using one of the wiring methods described in sections 3.0.2.7 and 3.0.2.20. Managers and equipment used in circuits with a nominal voltage greater than 600 volts shall comply with all applicable provisions of the preceding sections of this section and subsequent sections supplementing or amending the preceding sections. Under no circumstances shall the provisions of Part 2.30.8 apply to equipment on the supply side of the service centre. Individual open cables and cables other than service cables shall not be laid less than 3 000 mm above level or physically damaged. Conductors other than installation managers shall not be installed in the same operating circuit or operating cable. When a runway enters a building or structure from an underground distribution system, it shall be sealed in accordance with point 3.0.1.5(g). Replacement tracks or unused tracks must also be sealed. Sealants must be labelled with cable insulation, shielding or other components to be used. c) Suitable for use. Any separation device must be adapted to the existing conditions.

Service equipment installed in potentially explosive atmospheres shall meet the requirements of Articles 5.0 to 5.17. Exception 3: A single-family home unit and a separate structure are permitted to have a set of entry-level managers at a single distance or laterally. In weather conditions, walkways surrounding service line ladders must be raintight and drained. If embedded in the masonry, the raceways must be arranged in such a way as to be drained. The point of attachment of the relief ladder to a building or other structure shall have the minimum distances specified in 2.30.1.9 and 2.30.2.3. This attachment point shall in no case be less than 3 000 mm above the finished grade. In addition to the requirements of 2.30.4.3 (a), the minimum load-bearing current capacity of grounded conductors of certain systems shall not be less than the rated power of the release agents in operation specified in 2.30.6.10 (a) to (d). (a) Ungrounded conductor. This protection shall be provided by means of an overcurrent device in series with each unearthed operator, the rated power or setting of which does not exceed the permissible current load capacity of the conductor. A set of fuses is defined as the set of fuses necessary to protect all grounded conductors of an electrical circuit. Single-pole circuit breakers grouped in accordance with point (b) of point 2.30.6.2 shall be considered as a protective device. Service cables shall be supported within 300 mm of each service head, gooseneck or connection to a track or enclosure and at intervals not exceeding 750 mm using belts or other approved devices.

(7) Control circuits for electrically operated release agents, if appropriate overcurrent protection and release agents are available We take great pride in working with our local communities to provide private and commercial members with cost-effective, reliable and safe electricity. The information on this page is intended for those establishing facilities for temporary or permanent operation in the CEP service area. Runways shall be equipped with an impermeable service head at the junction with the discharge ladders. Service cables must be equipped with a waterproof service head. FPN Fig. 1: An earth defect protection that acts to open the disconnection does not provide interference protection on the line side of the protection element. It only serves to limit damage to conductors and equipment on the load side in the event of a fault in grounding the arc on the load side of the protective element. (3) Meter disconnectors with a nominal voltage not exceeding 600 volts with a short-circuit current equal to or greater than the available short-circuit current, provided that all metal housings and service boxes are grounded. (2) Meters and meter outlets with a nominal voltage not exceeding 600 volts, provided that all metal enclosures and service enclosures are grounded If you need to set up a service, please contact the nearest district office directly. The contact details of each office can be found on the map below or on our contact page.

Where necessary to prevent tampering, an automatic overcurrent device protecting managers serving only a specific load, such as a water heater, may be locked or sealed if it is arranged in such a way as to be accessible. Exception 4: A two-family house or residential complex may be equipped with a set of service input conductors to supply the circuits referred to in point 2.10.2.7. (a) Device Type. Equipment for the protection of plant managers shall comply with the requirements of Part 4.90.2. (9) Circuit breaker or melting circuit breaker, if necessary. This equipment shall be considered as additional protection, while the next separator referred to in 2.30.6.1 (a) (1) shall continue to be considered as a service facility. A building or other structure that: which is served, may be provided by only one service, unless permitted by points (a) to (d) of section 2.30.1.2. For the purposes of 2.30.4.1 Exception 2, only assemblies of underground conductors of 50 mm2 or more located at the same location and connected on the supply side but not connected on the load side are considered a service.

Service equipment rated at or below 600 volts shall be marked as suitable for use as service equipment. Individual meter socket boxes are not considered service devices. The current carrying capacity of managers before the application of the adjustment or correction factors shall not be less than (a)(1) or (a)(2).